Testing & Quality Control

Testing & Quality Control

All the instrument transformers upto 420kV have been type tested as per IEC/IS standards. Instrument transformers have also been type tested for Seismic withstand test at 0.5g on all 3axis & fast transient test.

There are 8 testing labs out of which 5 are routine testing & 2 dedicated test labs for incoming raw material & one 850kV Discharge free test lab with Resonant Test System.

The routine testing labs are equipped with latest equipments to carry out all routines tests as per IEC/ IS / BS/ AS and ANSI standards.

To ensure failure proof & resilient product, raw material testing is one of the major priorities at Mehru. All the raw materials are procured from carefully selected vendors & passed through stringent in-house testing before being used.

Incoming raw material test lab is equipped to carry out all routine tests on various raw materials like Insulating paper, copper, Transformer Oil, Insulator, Core etc.